2014
Abel García-Nájera María del Carmen Gómez Fuentes

The software project scheduling problem considers the assignment of employees to project tasks with the aim of minimizing the project cost and delivering the project on time. Recent research takes into account that each employee is proficient in some development tasks only, which requiere specific skills. However, this cannot be totally applied in the Mexican context due to software companies d...

In this research, we study the multi-skill resource-constrained project scheduling problem, where there are generalized precedence relations between project activities. Workforces are able to perform one or several skills, and their efficiency improves by repeating their skills. For this problem, a mathematical formulation has been proposed that aims to optimize project completion time, reworki...

Journal: :IEEE Trans. Knowl. Data Eng. 1991
S. J. Noronha V. V. S. Sarma

Scheduling is the process of devising or designing a procedure for a particular objective, specifying the sequence or time for each item in the procedure. Qpical scheduling problems are railway time-tabling, project scheduling, production scheduling, and scheduling computer systems as in flexible manufacturing systems and multiprocessor scheduling. Further, there are a number of related problem...

F hosseinzadeh lotfi M.A Shafiiee M.R Shahriyary

The time - cost tradeoff problem is one of the most critical issues in the project scheduling field and so far, a lot of research has been done with a variety of quantitative and qualitative approaches on this subject. In this research, we intend to provide a two - objective mathematical model which balances crash and delay for activities. So that it provides the right tools for decision makers...

Journal: :international journal of industrial engineering and productional research- 0
m. ranjbar no.516, department of industrial engineering, faculty of engineering, ferdowsi university of mashhad

in this paper, we consider scheduling of project networks under minimization of total weighted resource tardiness penalty costs. in this problem, we assume constrained resources are renewable and limited to very costly machines and tools which are also used in other projects and are not accessible in all periods of time of a project. in other words, there is a dictated ready date as well as a d...

Projects scheduling by the project portfolio selection, something that has its own complexity and its flexibility, can create different composition of the project portfolio. An integer programming model is formulated for the project portfolio selection and scheduling.Two heuristic algorithms, genetic algorithm (GA) and simulated annealing (SA), are presented to solve the problem. Results of cal...

Journal: :journal of optimization in industrial engineering 2013
bahman naderi

this paper investigates the problem of selecting and scheduling a set of projects among available projects. each project consists of several tasks and to perform each one some resource is required. the objective is to maximize total benefit. the paper constructs a mathematical formulation in form of mixed integer linear programming model. three effective metaheuristics in form of the imperialis...

1998
Peter Brucker

The objective of the project is to study classes of scheduling problems arising in connection with production planning and with the design of computer operating systems Such problems are more complex than classical scheduling environments because in most cases several additional constraints have to be satis ed In this project models representing these problems will be formulated and basic solut...

Journal: :XIKUA Boletín Científico de la Escuela Superior de Tlahuelilpan 2013

K. Zia Dabirian, K. Zia Ghazvini, M. Khanzadi,

Highway construction projects are one of the most important construction projects in the world. Therefore predicting the time of these kinds of projects is important. Basically highway projects are including few activities which are repeating along the horizontal direction. One of the best methods for scheduling these types of projects is linear scheduling method. The repetitive nature of the h...