The aim of a multi-mode resource-constrained project scheduling problem (MRCPSP) is to assign resource(s) with the restricted capacity to an execution mode of activities by considering relationship constraints, to achieve pre-determined objective(s). These goals vary with managers or decision makers of any organization who should determine suitable objective(s) considering organization strategi...
A project network often has some activities or groups of activities which can be performed at diierent stages of the project. Then, the problem of nding an optimal time or/and optimal order of such an activity or a group of activities arises. Such problems emerge, in particular, in house-building management when the beginnings of some activities may vary in time or/and order. We consider a math...
Production scheduling (planning) of an open-pit mine is the procedure during which the rock blocks are assigned to different production periods in a way that the highest net present value of the project achieved subject to operational constraints. The paper introduces a new and computationally less expensive meta-heuristic technique known as imperialist competitive algorithm (ICA) for long-term...
In this paper, we present a genetic algorithm (GA) for optimization of a multi-mode resource constrained time cost trade off (MRCTCT) problem. The proposed GA, each activity has several operational modes and each mode identifies a possible executive time and cost of the activity. Beyond earlier studies on time-cost trade-off problem, in MRCTCT problem, resource requirements of each execution mo...
a successful software should be finalized with determined and predetermined cost and time. software is a production which its approximate cost is expert workforce and professionals. the most important and approximate software cost estimation (sce) is related to the trained workforce. creative nature of software projects and its abstract nature make extremely cost and time of projects difficult ...
This study aims to deal with a more realistic combined problem of project scheduling and material ordering. The goal is to minimize the total material holding and ordering costs by determining the starting time of activities along with material ordering schedules subject to some constraints. The problem is first mathematically modelled. Then a hybrid simulated annealing and genetic algorithm is...
: nowadays, organizations are faced with a multitude of project and investment opportunities. despite the importance of various criteria, complexity of multi-objective models and weakness of optimization algorithms often compelled manager to limit the selection criteria or only suffice to financial objects. in this paper, it is endeavored to extend selection criteria by using an efficient optim...
magnetic levitation (maglev) is amongst the most advanced technologies that are available to the transportation industries. it has already been noticed by decision makers in many countries around the globe. contrary to such high levels of interest, there are no practical algorithms available to the engineers and/or managers to assist them in analyzing economics of the maglev systems. therefore,...
In this paper, we propose an energy-efficient mathematical model for the resource-constrained project scheduling problem to optimize makespan and consumption of energy, simultaneously. In the proposed model, resources are speed-scaling machines. The problem is NP-hard in the strong sense. Therefore, a multi-objective fruit fly optimization algorithm (MOFOA) is developed. The MOFOA uses the VIKO...