نتایج جستجو برای: multi-stage machines

تعداد نتایج: 852656  

Journal: :journal of industrial engineering, international 2011
l mahdavi v zarezadeh p shahnazari-shahrezaei

this article addresses a multi-stage flowshop scheduling problem with equal number of unrelated parallel machines. the objective is to minimize the makespan for a given set of jobs in the system. this problem class is np-hard in the strong sense, so a hybrid heuristic method for sequencing and then allocating operations of jobs to machines is developed. a number of test problems are randomly ge...

Journal: :مهندسی صنایع 0
حسن خادمی زارع دانشگاه صنعتی امیرکبیر سیدمحمدتقی فاطمی قمی دانشگاه صنعتی امیرکبیر بهروز کریمی دانشگاه صنعتی امیرکبیر مسعود جنابی دانشگاه صنعتی امیرکبیر عباس راد دانشگاه صنعتی امیرکبیر

in this paper, a hybrid method for limited resource allocation and leveling in complex multi-stage, multi-product and multi-period production planning problems with aim of lot-size determination and total cost minimization has been proposed. this problem consists of multiple products with sequential production processes that are produced in different periods to meet the customers demand. by det...

L Mahdavi P Shahnazari-Shahrezaei V Zarezadeh

This article addresses a multi-stage flowshop scheduling problem with equal number of unrelated parallel machines. The objective is to minimize the makespan for a given set of jobs in the system. This problem class is NP-hard in the strong sense, so a hybrid heuristic method for sequencing and then allocating operations of jobs to machines is developed. A number of test problems are randomly ge...

پایان نامه :وزارت علوم، تحقیقات و فناوری - دانشگاه تحصیلات تکمیلی صنعتی کرمان - دانشکده عمران 1392

با توجه به توسعه کلان شهرها و مسائل ترافیکی موجود ، نیاز روزافزون به احداث تونل ها و فضاهای زیرزمینی در اعماق مختلف موردتوجه قرار گرفته است . تونل سازی با توجه به تغییرات نحوه تمرکز تنش وجابجایی های ایجاد شده در سطح زمین در فضای بالای محل حفاری نیاز به مطالعات فراوان در مورد منحنی تغییر شکل طولی زمین یا همان ldpدر حفر تونل ، نحوه حفاری و نحوه مقاوم سازی را ایجاب می کند . حال آنکه حفاری در محیط ...

A two-stage hybrid flow shop problem can be considered as part of a larger issue; when solved, it can find a partial solution of a main and bigger problem. Here and in the current paper, a two-stage hybrid flow shop problem with one machine in the first stage and two machines in the second stage with three criteria such as: 1) maximum manufacturing time, 2) average manufacturing time and 3) sum...

Establishment of rating curves are often required by the hydrologists for flow estimates in the streams, rivers etc. Measurement of discharge in a river is a time-consuming, expensive, and difficult process and the conventional approach of regression analysis of stage-discharge relation does not provide encouraging results especially during the floods. P

2007
Atsushi Igarashi Masashi Iwaki

We develop virtual machines and compilers for a multi-level language, which supports multi-stage specialization by composing program fragments with quotation mechanisms. We consider two styles of virtual machines—ones equipped with special instructions for code generation and ones without—and show that the latter kind can deal with, more easily, low-level code generation, which avoids the overh...

Journal: :international journal of industrial engineering and productional research- 0
parviz fattahi hamedan, iran seyed mohammad hassan hosseini tehran, iran fariborz jolai tehran, iran azam dokht safi samghabadi tehran, iran

a three stage production system is considered in this paper. there are two stages to fabricate and ready the parts and an assembly stage to assembly the parts and complete the products in this system. suppose that a number of products of different kinds are ordered. each product is assembled with a set of several parts. at first the parts are produced in the first stage with parallel machines a...

A three stage production system is considered in this paper. There are two stages to fabricate and ready the parts and an assembly stage to assembly the parts and complete the products in this system. Suppose that a number of products of different kinds are ordered. Each product is assembled with a set of several parts. At first the parts are produced in the first stage with parallel machines a...

نمودار تعداد نتایج جستجو در هر سال

با کلیک روی نمودار نتایج را به سال انتشار فیلتر کنید