Production scheduling (planning) of an open-pit mine is the procedure during which the rock blocks are assigned to different production periods in a way that the highest net present value of the project achieved subject to operational constraints. The paper introduces a new and computationally less expensive meta-heuristic technique known as imperialist competitive algorithm (ICA) for long-term...

Journal: :journal of mining and environment 2016
m. mokhtarian asl j. sattarvand

production planning of an open-pit mine is a procedure during which the rock blocks are assigned to different production periods in a way that leads to the highest net present value (npv) subject to some operational and technical constraints. this process becomes much more complicated by incorporation of the uncertainty existing in the input parameters. the commodity price uncertainty is among ...

Journal: :journal of mining and environment 2011
j. gholamnejad a.r. mojahedfar

the determination of the ultimate pit limit (upl) is the first step in the open pit mine planning process. in this stage that parts of the mineral deposit that are economic to mine are determined. there are several mathematical, heuristic and meta-heuristic algorithms to determine upl. the optimization criterion in these algorithms is maximization of the total profit whilst satisfying the...

2013
Daniel Espinoza Adolfo Ibañez

In order to carry out an open pit mining operation, planners must periodically prepare what is known as strategic mine plan. This is a tentative production schedule for the remaining life of the mine that defines which area of a mining reserve will be extracted, in what years this extraction will take place, which resources will be used for the extraction, and how the extracted material will be...

A.D. Akbari, M. Osanloo , M.A. Shirazi ,

Planning and design procedure of an open pit mining project just can be started after ultimate pit determination. In the carried out study in this paper it was shown that the most important factor in ultimate pit determination and in consequence in the whole planning and design procedure of an open pit mine is the metal price. Metal price fluctuations in recent years were exaggerated and impose...

Journal: :int. journal of mining & geo-engineering 2012
a. khodayari a. jafarnejad

in the open-pit mining, one of the first decisions that must be made in production planning stage, after completing the design of final pit limits, is determining of the processing plant cut-off grade. since this grade has an essential effect on operations, choosing the optimum cut-off grade is of considerable importance. different goals may be used for determining optimum cut-off grade. one of...

A.R. Mojahedfar J. Gholamnejad

The determination of the Ultimate Pit Limit (UPL) is the first step in the open pit mine planning process. In this stage that parts of the mineral deposit that are economic to mine are determined. There are several mathematical, heuristic and meta-heuristic algorithms to determine UPL. The optimization criterion in these algorithms is maximization of the total profit whilst satisfying...

The mine production planning defines a sequence of block extraction to obtain the highest NPV under a number of constraints. Mathematical programming has become a widespread approach to optimize production planning, for open pit mines since the 1960s. However, the previous and existing models are found to be limited in their ability to explicitly incorporate the ore grade uncertainty into the p...

2010
A. D. Akbari M. Osanloo M. A. Shirazi

Planning and design procedure of an open pit mining project just can be started after ultimate pit determination. In the carried out study in this paper it was shown that the most important factor in ultimate pit determination and in consequence in the whole planning and design procedure of an open pit mine is the metal price. Metal price fluctuations in recent years were exaggerated and impose...

Open-Pit Production Scheduling (OPPS) problem focuses on determining a block sequencing and scheduling to maximize Net Present Value (NPV) of the venture under constraints. The scheduling model is critically sensitive to the economic value volatility of block, block weight, and operational capacity. In order to deal with the OPPS uncertainties, various approaches can be recommended. Robust opti...