Flexible job-shop scheduling problem derived from the job-shop scheduling problem, and is more realistic than the job-shop scheduling problem in the manufacturing enterprise. It should be utilized with high efficiency. But it is a multi-objective optimal problem. Three minimization objectives (Maximum completion time (makespan), Total workload of machines and Workload of the critical machine) a...
The Flexible Job Shop Scheduling Problem (FJSP) is one of the most general and difficult of all traditional scheduling problems. The Flexible Job Shop Problem (FJSP) is an extension of the classical job shop scheduling problem which allows an operation to be processed by any machine from a given set. The problem is to assign each operation to a machine and to order the operations on the machine...
Flexible job shop scheduling problem )FJSP( is an extension of the classical job shop scheduling problem which allows an operation to be processed by any machine from a given set. FJSP is NP-hard and mainly presents two difficulties. The first one is to assign each operation to a machine out of a set of capable machines, and the second one deals with sequencing the assigned operations on the ma...
In this paper, an exact geometric algorithm is presented for solving two-job sequencing and scheduling problems in flexible flow shop and job shop environments while the resources are (un)available in some time periods and processors (un)availability is the same in all work centers. This study seems utterly new and it is applicable to any performance measure based on the completion time. The in...
Today, the flow shop environment is the most customary production area in industry. But, the need to increase the capacity or the capacity balance in different production processes has caused that in some working stations there exists more than one machine. This type of flow shops are usually named hybrid flow shop, multi processes flow shop, flexible flow shop or flow shop with parallel machin...
tendency to optimization in last decades has resulted in creating multi-product manufacturing systems. production planning in such systems is difficult, because optimal production volume that is calculated must be consistent with limitation of production system. hence, integration has been proposed to decide about these problems concurrently. main problem in integration is how we can relate pro...
Flexible flow shop scheduling problem (FFS) with unrelated parallel machines contains sequencing in flow shop where, at any stage, there exists one or more processors. The objective consists of minimizing the maximum completion time. Because of NP-completeness of FFS problem, it is necessary to use heuristics method to address problems of moderate to large scale problem. Therefore, for assessme...
in this paper, we considered solving approaches to flexible job shop problems. makespan is not a good evaluation criterion with overlapping in operations assumption. accordingly, in addition to makespan, we used total machine work loading time and critical machine work loading time as evaluation criteria. as overlapping in operations is a practical assumption in chemical, petrochemical, and gla...
In this article, we consider the minimization of the total tardiness in a flexible job-shop. In our knowledge, this criterion is not previously studied for this type of shop configuration. The total tardiness criterion was mainly considered in the single machine problem (Chu [Chu92] and Souissi et al. [SKC04]). Few references studied this criterion in a job-shop configuration. The priority rule...