نتایج جستجو برای: no wait flow shop

تعداد نتایج: 3683507  

Journal: :American Journal of Case Reports 2015

Journal: :journal of quality engineering and production optimization 2015
sahar tadayoni rad saiedeh gholami rasoul shafaei hany seidgar

this paper considers a two-stage assembly flow shop problem (tafsp) where m machines are in the first stage and an assembly machine is in the second stage. the objective is to minimize a weighted sum of earliness and tardiness time for n available jobs. jit seeks to identify and eliminate waste components including over production, waiting time, transportation, inventory, movement and defective...

Scheduling is an important subject of production and operations management area. In flow-shop scheduling, the objective is to obtain a sequence of jobs which when processed in a fixed order of machines, will optimize some well defined criteria. The concept of transportation time is very important in scheduling. Transportation can be done by robots. In situations that robots are used to transpor...

2010
Mohammad Kazem Sayadi Reza Ramezanian Nader Ghaffari-Nasab

Article history: Received 23 January 2010 Received in revised form 23 April 2010 Accepted 26 April 2010 Available online 26 April 2010 During the past two decades, there have been increasing interests on permutation flow shop with different types of objective functions such as minimizing the makespan, the weighted mean flow-time etc. The permutation flow shop is formulated as a mixed integer pr...

2004
A. V. Sleptchenko

In this paper we consider a repair shop location problem with uncertainties in demand. New local repair shops have to be opened at a number of locations. At these local repair shops, customers arrive with broken, but repairable, items. Customers go to the nearest open repair shop. Since they want to leave as soon as possible, a (small) inventory of working items is kept at the repair shops. A c...

G. Moslehi and M. Mahnam,

While a great portion of the scheduling literature focuses on time-based criteria, the most important goal of management is maximizing the profitability of the firm. In this paper, the net preset value criterion is studied taking account of linear time-dependent cash flows in single machine and flow shop scheduling problems. First, a heuristic method is presented for the single machine scheduli...

Mohammad Ali Beheshti Nia Reza Baradaran Kazemzadeh Seyyed Hesamoddin Zegardi

This study considers scheduling in Hybrid flow shop environment with unrelated parallel machines for minimizing mean of job's tardiness and mean of job's completion times. This problem does not study in the literature, so far. Flexible flow shop environment is applicable in various industries such as wire and spring manufacturing, electronic industries and production lines. After modeling the p...

Simultaneous production planning and scheduling has been identified as one of the most important factors that affect the efficient implementation of planning and scheduling operations for the production systems. In this paper, simultaneous production planning and scheduling is applied in a hybrid flow shop environment, which has numerous applications in real industrial settings. In this problem...

Journal: :Oper. Res. Lett. 2000
Jeffrey B. Sidney Chris N. Potts Chelliah Sriskandarajah

We consider a problem of scheduling jobs in two-machine no-wait ow shops for which the objective is to minimize the makespan. Each job, upon completion of its processing on the rst machine, must be transferred immediately to the second machine due to a no-wait in process constraint. Every job requires a setup time on each machine before it is processed. The setup on the second machine is antici...

2010
Miguel Cezar Santoro Marco Aurélio de Mesquita

This paper provides a simulation model to study the effect of the work-in-process control on due date performance in job shop environment. The due date performance is measured by both the number of tardy jobs and the total tardiness. The simulation runs include different shop configurations (flow shop and general job shop), workloads and sequencing rules. As expected, the results reveal that du...

نمودار تعداد نتایج جستجو در هر سال

با کلیک روی نمودار نتایج را به سال انتشار فیلتر کنید