This paper proposes an effective multi-objective differential evolution algorithm (MDES) to solve a permutation flow shop scheduling problem (PFSSP) with modified Dejong's learning effect. The proposed algorithm combines the basic differential evolution (DE) with local search and borrows the selection operator from NSGA-II to improve the general performance.  First the problem is encoded with a...

Today, the flow shop environment is the most customary production area in industry. But, the need to increase the capacity or the capacity balance in different production processes has caused that in some working stations there exists more than one machine. This type of flow shops are usually named hybrid flow shop, multi processes flow shop, flexible flow shop or flow shop with parallel machin...

Journal: :بین المللی مهندسی صنایع و مدیریت تولید 0
y. maboudian s. ebrahimnejad r. tavakkoli-moghaddam s. , hatami

in this paper, three-stage assembly flowshop scheduling is considered with respect to minimizing bi-objectives, namely mean flow time and mean tardiness. this problem is a model of production systems, which several production operations are done simultaneously and independently, and then produced components are collected and transferred to an assembly stage for the final operation. in this mode...

Journal: :European Journal of Operational Research 2012
Xiandong Zhang Steef L. van de Velde

We consider the NP-hard problem of scheduling n jobs in m two-stage parallel flow shops so as to minimize the makespan. This problem decomposes into two subproblems: assigning the jobs to parallel flow shops; and scheduling the jobs assigned to the same flow shop by use of Johnson’s rule. For m = 2, we present a 32 -approximation algorithm, and for m = 3, we present a 12 7 -approximation algori...

Farhad Ghassemi-Tari Laya Olfat

This paper considers the problem of scheduling n jobs in the generalized tardiness flow shop problem with m machines. Seven algorithms are developed for finding a schedule with minimum total tardiness of jobs in the generalized flow shop problem. Two simple rules, the shortest processing time (SPT), and the earliest due date (EDD) sequencing rules, are modified and employed as the core of seque...