The parallel machine scheduling problem is an important and difficult problem to be considered in the real-world situations. Traditionally, this problem consists of the scheduling of a set of independent jobs on parallel machines with the aim of minimizing the maximum job completion. In today's manufacturing systems, in which both early and tardy finishing of job processing are undesired, the o...
This paper surveys the literature related to solving traditional unrelated parallel-machine scheduling problems. It compiles algorithms for the makespan, total weighted sum of completion times, maximum tardiness, total tardiness, total earliness and tardiness, and multiple criteria performance measures. The review of the existing algorithms is restricted to the deterministic problems without se...
Dispatching rules are widely used to dynamically schedule the operations in a shop. Their efficiency depends on the performance criteria of interest. One of the most important objectives to deal with in a manufacturing system is the tardiness which can be measured through several performance measures. This paper proposes an effective procedure to estimate the first two central moments (i.e., th...
We use the Akers-Friedman geometric approach to solve the two jobs job-shop problem when there is an earliness cost on the first operation and a tardiness cost on the last operation of each job. We then generalize the problem by imposing earliness and tardiness costs on each operation and finally, we solve it using a dynamic programming algorithm. KeywordsEarliness-tardiness scheduling, Polyn...
In this study, a conceptual framework is given for the dynamic multi-project scheduling problem with weighted earliness/tardiness costs (DRCMPSPWET) and a mathematical programming formulation of the problem is provided. In DRCMPSPWET, a project arrives on top of an existing project portfolio and a due date has to be quoted for the new project while keeping the costs related to changes in the sc...
This paper deals with a bi-objective hybrid no-wait flowshop scheduling problem minimizing the makespan and total weighted tardiness, in which we consider transportation times between stages. Obtaining an optimal solution for this type of complex, large-sized problem in reasonable computational time by using traditional approaches and optimization tools is extremely difficult. This paper presen...
Customer profiles have rapidly changed over the past few years, with products being requested more customization and lower demand. In addition to advances in technologies owing Industry 4.0, manufacturers explore autonomous smart factories. This paper proposes a decentralized multi-agent system (MAS), including intelligent agents that can respond their environment autonomously through learning ...
Total weighted tardiness is a measure of customer satisfaction. Minimizing it represents satisfying the general requirement of on-time delivery. In this research, we consider an ant colony optimization (ACO) algorithm to solve the problem of scheduling unrelated parallel machines to minimize total weighted tardiness. The problem is NP-hard in the strong sense. Computational results show that th...
This paper proposes a novel, multi-objective integer programming model for an open-shop scheduling problem (OSSP). Three objectives are to minimize the makespan, total job tardiness and earliness, and total jobs setup cost. Due the complexity to solve such a hard problem, we develop a meta-heuristic algorithm based on multi-objective scatter search (MOSS), and a number of test problems are solv...