Project planning and scheduling is often addressed in the paradigm of combined fuzzy optimization, which largely owing to inherent features combination ensuing uncertainty determining variables, none more significant than timetables deadlines activities. As such, purpose current study present a novel metaheuristic model for aforementioned problem by applying ranking genetic algorithm on resourc...
this study aims to deal with a more realistic combined problem of project scheduling and material ordering. the goal is to minimize the total material holding and ordering costs by determining the starting time of activities along with material ordering schedules subject to some constraints. the problem is first mathematically modelled. then a hybrid simulated annealing and genetic algorithm is...
In project scheduling, many problems can arise when resource fluctuations are beyond acceptable limits. To overcome this, mathematical techniques have been developed for leveling resources. However, these produce a hard and inflexible approach in scheduling projects. The authors propose a simple resource leveling approach that can be used in scheduling projects with multi-mode execution activit...
Time–cost trade-off problems (TCT) are well-known in project management contents. This approach normally applied for scheduling of a project especially where the project should be completed under pre-determined deadline. This paper aims to extend time-cost trade-off (TCT) problems in order to provide a well-organized mechanism for both scheduling and rescheduling processes of a project. The pro...
We consider in this paper downlink scheduling for different traffic classes at the MAC layer of wireless systems based on orthogonal frequency division multiple access (OFDMA), such as the recent 3rd Generation Partnership Project (3GPP) long-term evolution (LTE)/LTE-A wireless standard. Our goal is to provide via the scheduling decisions quality of service (QoS), but also to guarantee fairness...
resource limitation in zero time may cause to some profitable projects not to be selected in project selection problem, thus simultaneous project portfolio selection and scheduling problem has received significant attention. in this study, budget, investment costs and earnings are considered to be stochastic. the objectives are maximizing net present values of selected projects and minimizing v...
in this paper an efficient three- stage algorithm is developed for software production cost and time estimation. first stage includes a hybrid model composed of cocomo and function points methods to increase estimation accuracy. second stage encompasses paired comparisons matrix of analytical hierarchy process to determine amount of any resources consumed in each step of software production by ...
In this paper we consider the non-preemptive variant of a multi-mode resource constrained project scheduling problem (MRCPSP) with mode identity, in which a set of project activities is partitioned into disjoint subsets while all activities forming one subset have to be processed in the same mode. We present a depth-first branch and bound algorithm for the resource constrained project schedulin...
This paper presents a multi-mode resource-constrained project scheduling problem (MRCPSP) with maximizing the net present value (NPV) form the project contractor’s point of view. Positive and negative cash flows are considered in this model. Furthermore, to make the model close to the real situations, four different models for positive cash flows are considered. Two meta-heuristics, called simu...