نتایج جستجو برای: Branch-and-Bound Algorithm

تعداد نتایج: 16930065  

Journal: :journal of optimization in industrial engineering 2010
amir hossein kamali dolatabadi seyed hamid reza pasandideh mehrzad abdi khalife

cellular manufacturing system (cms) is highly important in modern manufacturing methods. given the ever increasing market competition in terms of time and cost of manufacturing, we need models to decrease the cost and time of manufacturing. in this study, cms is considered in condition of dynamic demand in each period. the model is developed for facing dynamic demand that increases the cost of ...

Journal: :iranian journal of operations research 0
raheleh taghavi department of industrial engineering, faculty of engineering, ferdowsi university of mashhad, mashhad, iran. mohammad ranjbar department of industrial engineering, faculty of engineering, ferdowsi university of mashhad, mashhad, iran.

air defense is a crucial area for all naval combat systems. in this study, we consider a warship equipped with an air-defense weapon that targets incoming threats using surface-to-air missiles. we define the weapon scheduling problem as the optimal scheduling of a set of surface-to-air missiles of a warship to a set of attacking air threats. the optimal scheduling of the weapon results in an in...

One of the major disadvantages of using Branch and Bound algorithm to solve permutation bases problems by computer is the size of main memory required. The single Array Branch and Bound (SABB) method introduction here aims to overcome this deficiency, using only N memory locations as a vector of size N, and a single cell C with N bits.

Journal: :مهندسی صنایع 0
قاسم مصلحی مهندسی صنایع مهدی مهنام مهندسی صنایع

this paper addresses the problem of minimizing the sum of maximum earliness and tardiness on identical parallel machines scheduling problem. each job has a processing time and a due date. since this problem is trying to minimize and diminish the values of earliness and tardiness, the results can be useful for just–in-time production systems. it is shown that the problem is np-hard. using effici...

Journal: :journal of optimization in industrial engineering 2012
behrouz afshar nadjafi amir rahimi hamid karimi

in this paper we consider the non-preemptive variant of a multi-mode resource constrained project scheduling problem (mrcpsp) with mode identity, in which a set of project activities is partitioned into disjoint subsets while all activities forming one subset have to be processed in the same mode. we present a depth-first branch and bound algorithm for the resource constrained project schedulin...

One of the important factor in the design of automated guided vehicle systems (AGVS) is the flow path design. This paper presents a branch-and-bound algorithm to determining the flow path by considering not only loaded-vehicles, but also empty-vehicles. The objective is to find the flow path, which will minimize total travel of loaded vehicles. We know that in branch-and-bound method a branch c...

Journal: :ژورنال بین المللی پژوهش عملیاتی 0
r. rashid s. m. seyedhoseini a. bozorgi amiri

preemptively scheduling a set of independent jobs with release time on one processor is a historical problem. in this paper, the same problem has been considered in which objective is to minimize the mean flow time. to prepare a perfect branch-and-bound, some optimality conditions have been represented and they have been compared with the optimality conditions which have been proposed before. o...

In this paper we consider the non-preemptive variant of a multi-mode resource constrained project scheduling problem (MRCPSP) with mode identity, in which a set of project activities is partitioned into disjoint subsets while all activities forming one subset have to be processed in the same mode. We present a depth-first branch and bound algorithm for the resource constrained project schedulin...

In this paper, the problem of two-machine flow shop scheduling to minimize total energy costs under time-of-use tariffs is investigated. As the objective function of this study is not a regular measure, allowing intentional idle-time can be advantageous. So this study considers two approaches, one for non-delay version of the problem and the other one for a situation when inserting intentional ...

Journal: :journal of sciences, islamic republic of iran 2012
f. moeen moghadas

we consider the queueing maximal covering location-allocation problem (qm-clap) with an m/m/1 queueing system. we propose a new solution procedure based on decomposition of the problem into smaller sub-problems. we solve the resulting sub-problems both with a branch and bound algorithm and with the meta-heuristic grasp. we also solve the entire model with grasp. computational results for these ...

نمودار تعداد نتایج جستجو در هر سال

با کلیک روی نمودار نتایج را به سال انتشار فیلتر کنید