نتایج جستجو برای: setup cost reduction for defective and non defective items

تعداد نتایج: 19242487  

Journal: :international journal of supply and operations management 2014
m vijayashree r uthayakumar

in this paper, the study deals with the lead time and setup reduction problem in the vendor-purchaser integrated inventory model. the cost of capital (i.e., opportunity cost) is one of the key factors in making the inventory and investment decisions. lead time is an important element in any inventory system. the proposed model is presents an integrated inventory model with controllable lead tim...

In this paper, the study deals with the lead time and setup reduction problem in the vendor-purchaser integrated inventory model. The cost of capital (i.e., opportunity cost) is one of the key factors in making the inventory and investment decisions. Lead time is an important element in any inventory system. The proposed model is presents an integrated inventory model with controllable lead tim...

Journal: :journal of industrial engineering, international 2006
rasoul haji alireza haji

this paper deals with the single machine multi-product lot scheduling problem in which defective items are produced in any production run of each product. we have adopted the common cycle scheduling policy and assumed that the setup times for production of each product can be non-zero. further, we have assumed that defective items will be reworked and the inspection costs during the normal prod...

Alireza Haji Rasoul Haji

This paper deals with the single machine multi-product lot scheduling problem in which defective items are produced in any production run of each product. We have adopted the common cycle scheduling policy and assumed that the setup times for production of each product can be non-zero. Further, we have assumed that defective items will be reworked and the inspection costs during the normal prod...

Journal: :ژورنال بین المللی پژوهش عملیاتی 0
r. uthayakumar t. sekar

in this model, we establish an inventory model to determine the optimal inventory replenishment scheme for the economic production quantity (epq) model for imperfect, deteriorating items with sales return service under multiple production and rework setup. in one cycle, production process can produces the products in m production setups and reworks the defective items in one rework setup. the c...

Babak Haji Rasoul Haji,

In this paper we consider an imperfect production system which produces good and defective items and assume that defective items can be reworked. Due to the nature of rework process we do not restrict the rework rate to be equal to normal production rate or constant and assume that it is a random variable with an arbitrary distribution function. We also assume as it is true in most real world s...

Sekar, T., Uthayakumar, R.,

In this model, we establish an inventory model to determine the optimal inventory replenishment scheme for the economic production quantity (EPQ) model for imperfect, deteriorating items with sales return service under multiple production and rework setup. In one cycle, production process can produces the products in m production setups and reworks the defective items in one rework setup. The c...

پایان نامه :وزارت علوم، تحقیقات و فناوری - دانشگاه ولی عصر (عج) - رفسنجان - دانشکده ادبیات و علوم انسانی 1393

the present study investigated construct equivalence of multiple choice (mc) and constructed response (cr) item types across stem and content equivalent mc and cr items (item type ‘a’), non-stem-equivalent but content equivalent mc and cr items (item type ‘b’), and non-stem and non-content equivalent mc and cr items (item type ‘c’). one hundred seventy english-major undergraduates completed mc ...

The basic assumption in the traditional inventory model is that all outputs are perfect items. However, this assumption is too simplistic in the most real-life situations due to a natural phenomenon in a production process. From this it is deduced that the system produces non-perfects items which can be classified into four groups of perfect, imperfect, reworkable defective and non-reworkable d...

Journal: :Computers & OR 2006
Karl Inderfurth Adam Janiak Mikhail Y. Kovalyov Frank Werner

We study the problem of planning the production of new and recovering defective items of the same product manufactured on the same facility. Items of the product are produced in batches. The processing of a batch includes two stages. In the first work stage, all items of a batch are manufactured and good quality items go to the inventory to satisfy given demands. In the second rework stage, som...

نمودار تعداد نتایج جستجو در هر سال

با کلیک روی نمودار نتایج را به سال انتشار فیلتر کنید