Job-shop scheduling problem (JSP) is one of the most well-known machine scheduling problems and one of the strongly NP-hard combinatorial optimization problems. Cost optimization is an attractive and critical research and development area for both academic and industrial societies. This paper presents a cost driven model of the job-shop scheduling problem in which the solutions are driven by bu...
Motivated by the need to deal with uncertainties in energy optimization of flexible manufacturing systems, this paper considers a dynamic scheduling problem which minimizes the sum of energy cost and tardiness penalty under power consumption uncertainties. An integrated control and scheduling framework is proposed including two modules, namely, an augmented discrete event control (ADEC) and a m...
Assume that n tasks must be processed by one machine in a fixed sequence. The processing time, the preferred starting time and the earliness and tardiness costs per time unit are known for each task. The problem is to allocate each task a starting time such that the total cost incurred by the early and tardy tasks is minimum. Garey et al. have proposed a nice O(n log n) algorithm for the specia...
Abstract This paper explores the characteristics of solutions when scheduling jobs in a shop with parallel machines. Three classical objective functions were considered: makespan, total completion time, and tardiness. These three criteria combined pairs, resulting bi-objective formulations. formulations solved using ε-constraint method to obtain Pareto frontier for each pair. The research is ev...
In this paper, a due date assignment scheduling problem with precedence constraints and controllable processing times in uncertain environment is investigated, in which the basic processing time of each job is assumed to be the symmetric trapezoidal fuzzy number, and the linear resource consumption function is used.The objective is to minimize the crisp possibilistic mean (or expected) value of...
In this paper, a mixed integer programming model for Advanced Planning and Scheduling has been presented and implemented in Mann Plastic Company with the objective of minimizing cost of tardiness and earliness of an order. The proposed mathematical model considers capacity constraints, operation sequence, due date in multi order environment and outsourcing. In order to solve the mathematical ...
This paper considers a two-stage assembly flow shop scheduling problem. When all parts of each product are completed in the first stage, they are assembled into a final product on an assembly machine in the second stage. In order to reduce the delivery cost, completed products can be held until completion of some other products to be delivered in a same batch. The proposed problem addresses sch...