Farzaneh Abyaneh Saeedeh Gholami,

In this paper, the flow-shop scheduling problem with unrelated parallel machines at each stage as well as sequence-dependent setup times under minimization of the sum of earliness and tardiness are studied. The processing times, setup times and due-dates are known in advance. To solve the problem, we introduce a hybrid memetic algorithm as well as a particle swarm optimization algorithm combine...

The group scheduling problem in the cellular manufacturing system is comprised of two levels of scheduling. At the first level, the sequence of parts in each part-family is determined, and then at the second level the sequence of part-families is determined. In this paper, the flow shop group scheduling is investigated in order to minimize the makespan. In traditional group scheduling problems,...

Hybrid flow-shop or flexible flow shop problems have remained subject of intensive research over several years. Hybrid flow-shop problems overcome one of the limitations of the classical flow-shop model by allowing parallel processors at each stage of task processing. In many papers the assumptions are generally made that there is unlimited storage available between stages and the setup times a...

This paper presents a novel, multi-objective model of a parallel machines scheduling problem that minimizes the number of tardy jobs and total completion time of all jobs. In this model, machines are considered as unrelated parallel units with different speeds. In addition, there is some precedence, relating the jobs with non-identical due dates and their ready times. Sequence-dependent setup t...

Journal: :Journal of the Operations Research Society of Japan 1986