This paper discusses that the fuzzy metagraphs can be used as a tool for scheduling and control of fuzzy projects. Often, available resources for executing projects may be limited. It is assumed the resources required to accomplish each activity of project (metagraph edges) is renewable. One of the common methods for scheduling projects is using the min-slack. So, first, the forward and bac...

In this paper we consider the non-preemptive variant of a multi-mode resource constrained project scheduling problem (MRCPSP) with mode identity, in which a set of project activities is partitioned into disjoint subsets while all activities forming one subset have to be processed in the same mode. We present a depth-first branch and bound algorithm for the resource constrained project schedulin...

This paper presents a multi-mode resource-constrained project scheduling problem (MRCPSP) with maximizing the net present value (NPV) form the project contractor’s point of view. Positive and negative cash flows are considered in this model. Furthermore, to make the model close to the real situations, four different models for positive cash flows are considered. Two meta-heuristics, called simu...

Resource constrained project scheduling problem is one of the most important issues in project planning and management. The objective function of this problem is to minimize the completion time of a project. When there is budget constraint or high risk for investment, using the criteria such as cash flows is so important. The development of computer systems and processors makes it possible to t...

2007
C. Li J. M. van den Akker Sjaak Brinkkemper Guido Diepen

This paper investigates two integer linear programming models that integrate requirement scheduling into software release planning. The first model can schedule the development of the requirements for the new release exactly in time so that the project span is minimized and the resource and precedence constraints are satisfied. The second model is for combined requirement selection and scheduli...

I. Bossaghzadeh S. R. Hejazi Z. Pirmoradi

A common problem arising in project management is the fact that the baseline schedule is often disrupted during the project execution because of uncertain parameters. As a result, project managers are often unable to meet the deadline time of the milestones. Robust project scheduling is an effective approach in case of uncertainty. Upon adopting this approach, schedules are protected against po...

Journal: :Engineering Applications of Artificial Intelligence 2022

A common problem faced by organizations is how to select and schedule an optimal portfolio of projects subject various constraints, such as a limited budget. This known the project selection scheduling (PPSSP). Despite widespread nature this problem, no existing model adequately addresses sufficient set characteristics that arise in real-world problems. One contribution article proposal novel, ...

Large-scale projects often have several activities which are performed by subcontractors with limited multi-resources. Project scheduling with limited resources is one of the most famous problems in the research operations and optimization cases. The resource-constraint project scheduling problem (RCPSP) is a NP-hard problem in which the activities of a project must be scheduled to reduce the p...

پایان نامه :وزارت علوم، تحقیقات و فناوری - دانشگاه تربیت معلم تهران 1381

‏‎the purpose of the present study was to investigate the latent pattern underlying reading ability . some 272 male and female participants. english majors at the ba level , participated in the study. two valid tests were used in this study, the reading test developed exclusively for the purpose of this project and academic reading section of ielts. to investigate the possible latent underlying...

نمودار تعداد نتایج جستجو در هر سال

با کلیک روی نمودار نتایج را به سال انتشار فیلتر کنید