نتایج جستجو برای: surgery scheduling problem

تعداد نتایج: 1256511  

In this research, robotic cell scheduling problem with three CNC machines and with an operation on each machine with the purpose of optimizing manufacturing cost and time in S1 cycle has been investigated. To obtain the optimal total cost of production has been used the optimal processing time on machine operation. In this research, robotic cell scheduling is studied in three different situatio...

This paper presents a new mathematical model for a bi-objective job shop scheduling problem with sequence-dependent setup times that minimizes the weighted mean completion time and the weighted mean tardiness time. For solving this multi-objective model, we develop a fuzzy multi-objective linear programming (FMOLP) model. In this problem, a proposed FMOLP method is applied with respect to the o...

Extensive research has been devoted to resource constrained project scheduling problem. However, little attention has been paid to problems where a certain time penalty must be incurred if activity preemption is allowed. In this paper, we consider the project scheduling problem of minimizing the total cost subject to resource constraints, earliness-tardiness penalties and preemption penalties, ...

Journal: :Kirkuk University Journal-Scientific Studies 2010

Journal: :IEEE Design & Test of Computers 1995

Journal: :European Journal of Operational Research 1980

Journal: :amirkabir international journal of modeling, identification, simulation & control 2015
i. bossaghzadeh s. r. hejazi z. pirmoradi

a common problem arising in project management is the fact that the baseline schedule is often disrupted during the project execution because of uncertain parameters. as a result, project managers are often unable to meet the deadline time of the milestones. robust project scheduling is an effective approach in case of uncertainty. upon adopting this approach, schedules are protected against po...

Journal: :مهندسی برق و الکترونیک ایران 0
m. pourakbari-kasmaei m. rashidi-nejad s. piltan

this paper proposes a novel technique for solving generation scheduling and ramp rate constrained unit commitment. a modified objective function associated with a new start-up cost term is introduced in this paper. the proposed method is used to solve generating scheduling problem satisfying srr, minimum up and down time as well as ramp rate constraints. two case studies are conducted to implem...

Although several papers have studied no-idle scheduling problems, they all focus on flow shops, assuming one processor at each working stage. But, companies commonly extend to hybrid flow shops by duplicating machines in parallel in stages. This paper considers the problem of scheduling no-idle hybrid flow shops. A mixed integer linear programming model is first developed to mathematically form...

Journal: :Discrete Applied Mathematics 1990

نمودار تعداد نتایج جستجو در هر سال

با کلیک روی نمودار نتایج را به سال انتشار فیلتر کنید