Proper and realistic scheduling is an important factor of success for every project. In reality, project scheduling often involves several objectives that must be realized simultaneously, and faces numerous uncertainties that may undermine the integrity of the devised schedule. Thus, the manner of dealing with such uncertainties is of particular importance for effective planning. A realistic sc...

This paper presents a multi-mode resource-constrained project scheduling problem (MRCPSP) with maximizing the net present value (NPV) form the project contractor’s point of view. Positive and negative cash flows are considered in this model. Furthermore, to make the model close to the real situations, four different models for positive cash flows are considered. Two meta-heuristics, called simu...

Journal: :international journal of supply and operations management 0
denis pinha west virginia university, morgantown, wv, usa rashpal ahluwalia west virginia university, morgantown, wv, usa pedro senna federal center for technological education of rio de janeiro, rio de janeiro, brazil

this paper presents the formulation and solution of the combinatorial multi-mode resource constrained multi-project scheduling problem. the focus of the proposed method is not on finding a single optimal solution, instead on presenting multiple feasible solutions, with cost and duration information to the project manager. the motivation for developing such an approach is due in part to practica...

Journal: :journal of optimization in industrial engineering 2014
zahra sadat hosseini javad hassan pour emad roghanian

in this paper, a novel mathematical model for a preemption multi-mode multi-objective resource-constrained project scheduling problem with distinct due dates and positive and negative cash flows is presented. although optimization of bi-objective problems with due dates is an essential feature of real projects, little effort has been made in studying the p-mmrcpsp while due dates are included i...

Sama Ahmadpour Vahidreza Ghezavati

In this study, we aim to present a new model for the resource-constrained project scheduling problem (RCPSP) considering a working calendar for project members and determined the skill factor of any member using the efficiency concept. For this purpose, the recyclable resources are staff resources where any person with multiple skills can meet the required skills of activities in a given time. ...

In the last decade, theory of constraint application in project management lead to make a new approach for project scheduling and control as a critical chain. In this paper, a multi-objective optimization model for multi-project scheduling on critical chain is investigated. The objectives include time, cost and quality. In order to solve the problem, a Simulated Annealing algorithm is developed...

Mohammad Reza Abassi Mohsen Garmsiri

In project scheduling, many problems can arise when resource fluctuations are beyond acceptable limits. To overcome this, mathematical techniques have been developed for leveling resources. However, these produce a hard and inflexible approach in scheduling projects. The authors propose a simple resource leveling approach that can be used in scheduling projects with multi-mode execution activit...

Journal: :journal of optimization in industrial engineering 2012
behrouz afshar nadjafi amir rahimi hamid karimi

in this paper we consider the non-preemptive variant of a multi-mode resource constrained project scheduling problem (mrcpsp) with mode identity, in which a set of project activities is partitioned into disjoint subsets while all activities forming one subset have to be processed in the same mode. we present a depth-first branch and bound algorithm for the resource constrained project schedulin...

Journal: :journal of industrial engineering and management studies 0
f. molavi sadjad university of technology, mashhad, iran. e. rezaee nik sadjad university of technology, mashhad, iran.

resource limitation in zero time may cause to some profitable projects not to be selected in project selection problem, thus simultaneous project portfolio selection and scheduling problem has received significant attention. in this study, budget, investment costs and earnings are considered to be stochastic. the objectives are maximizing net present values of selected projects and minimizing v...

In this paper we consider the non-preemptive variant of a multi-mode resource constrained project scheduling problem (MRCPSP) with mode identity, in which a set of project activities is partitioned into disjoint subsets while all activities forming one subset have to be processed in the same mode. We present a depth-first branch and bound algorithm for the resource constrained project schedulin...